Manufacturing

The factory, in numbers.

What a sourcing audit would ask first: floor area, people, machines, inspection points and how goods leave the building. Every figure shows how it is counted and when it was last checked.

Facility & people

Production sites
6
Each 1,500 m² or larger.
As of
Production lines
8
Cutting, sewing, seam taping and finishing.
As of
Machines
276
Listed by process below.
As of
Staff
216
80% of frontline staff have 4+ years' experience.
As of
Headcount by department
DepartmentPeopleShare
Pattern & development83.7%
Cutting125.6%
Sewing12055.6%
Seam taping & special processes167.4%
Quality control125.6%
Packing & warehouse146.5%
Management & sales3415.7%
Total216100%
Operator sewing on an automatic machine
Sewing floor.

Equipment

What's on the floor.

Grouped by process step. 276 machines in total.

Process

24 machine groups

Production equipment by process step, 276 machines in total
MachineQtyProcess
Cutting tables2Cutting
Fabric spreaders2Cutting
Straight knives & end cutters5Cutting
CAD pattern plotters2Pattern
Lockstitch machines — Jack A4-8000D104Sewing
Overlock machines (3/4/5-thread)43Sewing
Double-needle machines25Sewing
Edge-trimming lockstitch machines7Sewing
Walking-foot machines5Sewing
Coverstitch machines3Sewing
Template sewing machines3Sewing
Programmable pattern sewers3Sewing
Automatic pocket-welting machines2Sewing
Feed-off-the-arm machine1Sewing
Bartack, buttonhole & snap machines29Bartack & snaps
Seam-taping machines6Seam taping
Printing machines3Printing
Fusing presses7Finishing
Ironing presses7Finishing
Vacuum tables & thread suckers3Finishing
Steam generators3Finishing
Heat sealers2Packing
Strapping machine1Packing
Air compressors8Utilities
Operator sewing on a Jack lockstitch machine
Jack lockstitch machine, 104 on the floor.

276 machines in total. The model is on record for the lockstitch machines only; the rest are listed by type.

Quality

Seven inspection points, ending in a final AQL check.

Final inspection to ANSI/ASQ Z1.4. Third-party inspection is welcome, and so are factory audits.

  1. Incoming fabric & trims

    Shade, specification and defects checked as materials arrive.

  2. Pre-production sample

    Approved by you before bulk cutting begins.

  3. Cut-panel check

    Cut panels checked before they go to the line.

  4. Inline inspection

    Size, stitching and workmanship checked during sewing, and reworked as found.

  5. Seam-taping check

    Taped seams checked at the seam-taping station.

  6. Finishing check

    Thread trimming, pressing and stain removal checked after finishing.

  7. Final AQL inspection

    Statistical sampling to ANSI/ASQ Z1.4 before packing.

Technicians testing fabric on a testing machine
Fabric testing.

Traceability

  • Batch numberOn every piece, traceable to line and date
  • RejectsDestroyed, never resold
  • Third-party inspectionWelcome
  • Factory auditsWelcome

Testing

Chemical and harmful-substance tests are run by independent labs. Two recent reports, both passed: a chemical safety test — REACH SVHC (253 substances), azo dyes (EN ISO 14362-1), formaldehyde (EN ISO 14184-1) — and a harmful-substance test to baby-article limit values. Shenzhen Tianqi Testing, 2026. See the reports

Sewing hall with an overhead hanger system

Virtual factory tour

A 360° tour is on the way.

We're preparing a walk-through of the cutting, sewing, seam-taping, inspection and warehouse floors. Meanwhile, factory visits are welcome — and so are factory audits.

How an order runs

Sixteen steps, from inquiry to after-sales.

Bulk ships in 45–60 days after the pre-production sample is approved. The first sample is ready in 48 hours.

  1. Inquiry

    Style, quantity, fabric, specification and delivery date confirmed.

    1 day · Sales
  2. Tech pack

    Design confirmed and the process sheet issued.

    1–2 days · Design
  3. Pattern & grading

    Pattern made and graded to the size set.

    1 day · Sampling
  4. Sampling

    First sample and revision samples. First sample in 48 hours.

    2 days · Sampling
  5. Quote & order

    Price agreed and the order placed.

    1 day · Sales
  6. Materials in

    Fabric and trims bought and checked on arrival — shade, specification, defects.

    3–5 days · Purchasing & QC
  7. Pre-production sample

    Sent for your approval before production starts.

    2 days · Sampling
  8. Cutting

    Marker, spreading, cutting and bundle numbering.

    1–2 days · Cutting
  9. Sewing

    Group assembly lines.

    By order size · Sewing
  10. Seam taping

    Taping and other special processes.

    2–3 days · Production
  11. Inline inspection

    Size, stitching and workmanship checked during production, reworked as found.

    During production · QC
  12. Finishing

    Thread trimming, pressing and stain removal.

    0.5–1 day · Finishing
  13. Final inspection

    AQL sampling inspection of the finished goods.

    0.5–1 day · QC
  14. Packing

    Folding, hangtags, bagging and cartons.

    0.5–1 day · Packing
  15. Shipping

    Packing list, customs documents and tracking.

    1 day · Sales & warehouse
  16. After-sales

    Complaints, repairs and reorders.

    Ongoing · Sales

Warehouse & shipping

Packed to your spec, shipped on your terms.

Finished-goods warehouse with racked cartons and bagged garments
Finished-goods warehouse.
Packing station: garments folded, bagged and labelled
Packing station.
  • Warehouse5,000 m²
  • In stock200,000 pcs
  • Bulk lead time45–60 days
  • Sampling7–10 days
  • First sample48 hours
  • MOQ300 pcs per color
  • Payment30% deposit, 70% against copy of B/L
  • Incoterms & portYour choice
  • PackingTo your specification

As of . Lead time counts from pre-production sample approval. Need it sooner? Contact our sales team.